Skip to content

Job status changed to complete, but the job was actually failed #156

@chengzhuzhang

Description

@chengzhuzhang

In a run, the job status showing:

16:26:16: e3sm_diags-0105-0109-DECK_v1_piControl-vs-obs: Job changed from Running to Completed

While checking the job log, e3sm_diags was actually failed.
Might be a bug.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions