Skip to content

Merge main back into develop #70

Merge main back into develop

Merge main back into develop #70

Triggered via pull request March 1, 2026 17:39
Status Failure
Total duration 1m 56s
Artifacts

ci.yml

on: pull_request
Matrix: build-and-test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
build-and-test (ubuntu-latest, 8.0.x)
Process completed with exit code 1.
build-and-test (macos-latest, 6.0.x)
The strategy configuration was canceled because "build-and-test.ubuntu-latest_8_0_x" failed
build-and-test (ubuntu-latest, 6.0.x)
The strategy configuration was canceled because "build-and-test.ubuntu-latest_8_0_x" failed
build-and-test (ubuntu-latest, 6.0.x)
The operation was canceled.
build-and-test (windows-latest, 6.0.x)
The strategy configuration was canceled because "build-and-test.ubuntu-latest_8_0_x" failed
build-and-test (windows-latest, 6.0.x)
The operation was canceled.
build-and-test (windows-latest, 8.0.x)
The strategy configuration was canceled because "build-and-test.ubuntu-latest_8_0_x" failed
build-and-test (windows-latest, 8.0.x)
The operation was canceled.
code-quality
Process completed with exit code 2.
build-and-test (macos-latest, 8.0.x)
The strategy configuration was canceled because "build-and-test.ubuntu-latest_8_0_x" failed
build-and-test (macos-latest, 8.0.x)
The operation was canceled.