Repository navigation
Description
The catalog-based time-reporting scenario in #8336 can qualify native time_based_views, validate returned measurements and preserve metric narrowing, but the current closed storyboard language cannot faithfully derive the conditions for omitted-value/missing-disclosure reconciliation.
Normative authority: static/schemas/source/media-buy/get-media-buy-delivery-response.json, by_package[].missing_metrics: use commitments with committed_at < reporting_period.end (strict), current product metadata when commitments are absent, and exclude metrics not yet measurable in the current measurement window. Neither a window named final, is_final, zero expected delay nor injected impressions proves per-metric measurability.
Verified against merged SDK foundation 37d308768b01b99f4650800d5af7cfc051b40e9e and merged authoring contract #8376. Existing refs_resolve can compare captured accepted/report snapshots and arbitrary commitment indexes once eligibility is independently established. Phase expressions have no ISO timestamp ordering; numeric comparisons reject timestamp strings; scoped refs cannot derive that dynamic relation. Product measurement windows have no per-metric measurability mapping. simulate_delivery accepts no time-view/grain injection or maturity assertion.
Concrete counterexample: accepted standard time commitment, a reporting fixture stipulated mature, then the time carrier and its matching missing_metrics entry both disappear. Current schema/shape checks alone pass. This is a known coverage gap, not conformant seller behavior or permission to omit required disclosure. #8336 will explicitly disclose this limit instead of inventing maturity from unrelated fields.
Acceptance:
- Qualify strict
committed_at < reporting_period.end; equality/later commitments are excluded. - Establish measurement eligibility from trustworthy existing evidence or a separately reviewed fixture/runner contract; never infer it from
is_finalalone. - Honor current selected-product fallback when commitments are absent.
- A due, measurable unqualified standard time commitment with neither value nor disclosure fails; legal uncommitted/immature/disclosed-unavailable/empty-array cases remain valid.
- Compare the same captured report, preserving ordinary schema, identity, narrowing, raw failure evidence and full/standalone behavior.
- Keep future declarations/controller grain injection separate; no new mandatory seller feature is implied.
Maintainer direction explicitly makes this follow-up nonblocking for the bounded format/time reporting correction in #8336. It does not claim #8254 fully complete.
Activity