Repository navigation
docs(menu-separator): phase 8 review - #6892
blunteshwar wants to merge 1 commit into
Conversation
|
|
No code issues. Notes: the plan now ticks "PR created" with a hard-coded PR range, which will go stale. The status table ( |
8562f97 to
3581e7c
Compare
📚 Branch Preview Links🔍 Gen1 Visual Regression Test ResultsWhen a visual regression test fails (or has previously failed while working on this branch), its results can be found in the following URLs:
Deployed to Azure Blob Storage: If the changes are expected, update the |
Description
Phase 8 (review) of the
swc-menu-separatormigration. Stacked on #6891 (Phase 7) and targets themenu-separator-migrationfeature branch, so the diff includes earlier phases until they merge.Epic: SWC-2668.
yarn lint:gen2passes.Open items
swc-menu-itemandswc-menu-group.Validation
yarn lint:gen2: passedyarn workspace @spectrum-web-components/gen2 build: passed (Phase 7)npx vitest --run --project storybook menu-separator: passed (Phase 6)