Skip to content

Give Airlock E2E session cleanup a timeout independent of the final test #5175

Closed

Description

@JayDoubleu

Session cleanup inherited the final test's 600-second timeout. A passing test could then fail during slow workspace teardown.

Related changes are combined into fewer PRs for review. Earlier PRs and test results remain as historical evidence.

Current position

Item Status and evidence
Current implementation PR #5255
Earlier PRs PR #5193
Completion Merging PR #5255 into main closes this issue.
Position Independent cleanup deadlines implemented; later cleanup passed.
Observed failure Airlock teardown timeout.
Live validation 3 extended cases passed. Tests and deployment ae9314e5; 23 smoke tests passed. Child VM, NIC and workspace cleanup were verified.
Live validation 2 targeted cases passed. Tests and deployment c486c015; draft deletion and import review VM flow passed. API and Azure cleanup were verified.

Scope

  • Give workspace and service cleanup their own one-hour deadline.
  • Wait for cancellation before starting another fixture, preserve the original test failure and log the last operation state.

Remaining work

  • Merge the reviewed timeout correction.

Related work

Parent: #5119.

Activity

  1. added
    v0.30.0-prep-v2Current v0.30.0 preparation: stacked PRs and open follow-up issues. Keep after closure.
    on Oct 10, 2026
  2. removed
    v0.30.0-prep-v2Current v0.30.0 preparation: stacked PRs and open follow-up issues. Keep after closure.
    on Oct 12, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions