Repository navigation
docs(ci): record rollout and reconcile protected promotion ancestry - #3814
Merged
Merged
Conversation
release: stage repository, CI, OCR and local database updates
release: promote verified Vercel build optimizations to data
release: promote verified nightly admission fix to data
This was referenced Nov 12, 2026
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Why
The next protected develop → data promotion has conflicting historical merge ancestry. The two conflicts are in the nightly source-contract test and local Supabase baseline provisioning.
Change
20fd13c9ff4026eff82f87a62983e258d91a4300into the develop candidate based on8a75965476b9d70084a56e72fe8d514e8020c8a8.docs/operations/cicd-simplification.mdto record PRs perf(ci): scope PR checks and require complete results #3810–chore(release): retire bypassing sync helper and prepare staged promotion #3813, saved required checks, completed post-merge checks, observed job selection, and the remaining production/Mac boundaries.Verification
8b7d254b91cfc850587958541a27ea76bea64264, matching the tested develop head.f6853410d1b49deca57de9310281dfa470ba5bf3.git diff --checkpass.Release boundary
This is protected source preparation. The subsequent develop → data PR will retain full promotion checks. No production deployment, main-only activation, provider mutation, or Mac service cleanup is performed here. The active Vercel connection still cannot identify the project/current rollback target.
Hosted documentation-only observation
Exact head:
592e713c6968e07c254aaf30a12787e173d02609.Observed web CI timings
All measurements use each named run's exact head and completed attempt 1.
Elapsed is run creation to the latest job completion. Initial wait is run creation to the earliest non-skipped job start; it is not total queue time. Summed job duration includes parallel setup/cleanup and result jobs. These different changes select different workloads, so this is an observation table, not a controlled speedup, billing, CPU, or whole-PR readiness measurement.