Skip to content

docs(ci): record rollout and reconcile protected promotion ancestry - #3814

Merged
twoimo merged 4 commits into
developfrom
fix/promotion-reconcile-20261113
Nov 12, 2026
Merged

twoimo merged 4 commits into
developfrom
fix/promotion-reconcile-20261113

Conversation

@twoimo

@twoimo twoimo commented Nov 12, 2026 •

Copy link
Copy Markdown
Owner

Why

The next protected develop → data promotion has conflicting historical merge ancestry. The two conflicts are in the nightly source-contract test and local Supabase baseline provisioning.

Change

  • Join the exact reviewed data head 20fd13c9ff4026eff82f87a62983e258d91a4300 into the develop candidate based on 8a75965476b9d70084a56e72fe8d514e8020c8a8.
  • Preserve both branches' intended behavior. The resolved runtime, tests, and configuration are byte-identical to the already-verified develop tree; the classifier and platform-preserving baseline behavior remain intact.
  • Update only docs/operations/cicd-simplification.md to record PRs perf(ci): scope PR checks and require complete results #3810–chore(release): retire bypassing sync helper and prepare staged promotion #3813, saved required checks, completed post-merge checks, observed job selection, and the remaining production/Mac boundaries.
  • Use this useful documentation update to observe the hosted documentation-only CI lane before the later branch-structure transition.

Verification

  • Before the documentation update, the resolved complete tree was exactly 8b7d254b91cfc850587958541a27ea76bea64264, matching the tested develop head.
  • Final candidate tree: f6853410d1b49deca57de9310281dfa470ba5bf3.
  • Only one file differs from develop: the rollout runbook. Relative links and git diff --check pass.
  • Existing passing code suites were not rerun locally because no runtime or test bytes changed. Hosted checks for this exact candidate will be verified before merge.
  • Phase4 post-merge CI, Release, and CodeQL completed successfully.

Release boundary

This is protected source preparation. The subsequent develop → data PR will retain full promotion checks. No production deployment, main-only activation, provider mutation, or Mac service cleanup is performed here. The active Vercel connection still cannot identify the project/current rollback target.

Hosted documentation-only observation

Exact head: 592e713c6968e07c254aaf30a12787e173d02609.

  • Web CI: success; the scope and final CI jobs ran, with eight skipped API job records.
  • Security: success; scope and final Security ran, with seven skipped jobs.
  • The skipped web unit matrix is one unexpanded API record, not eight executed jobs. These counts must not be described as fifteen actual skipped web jobs.
  • Release, Promotion Path, and applicable CodeQL remain independent checks; the documentation scope does not replace them.

Observed web CI timings

All measurements use each named run's exact head and completed attempt 1.

Input PR / run Executed / skipped API records Elapsed seconds Initial wait seconds Sum of executed job seconds
Backend #3811 / 43254101716 11 / 6 310 4 1581
Full compatibility #3813 / 43256948902 17 / 0 905 3 4568
Documentation #3814 / 43266364981 2 / 8 32 4 26

Elapsed is run creation to the latest job completion. Initial wait is run creation to the earliest non-skipped job start; it is not total queue time. Summed job duration includes parallel setup/cleanup and result jobs. These different changes select different workloads, so this is an observation table, not a controlled speedup, billing, CPU, or whole-PR readiness measurement.

release: stage repository, CI, OCR and local database updates
release: promote verified Vercel build optimizations to data
release: promote verified nightly admission fix to data
@twoimo
twoimo merged commit 31f3fd7 into develop Nov 12, 2026
30 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant